Engineering

Municipal Stormwater IDDE Program

Date Uploaded: 

Fri, 01/30/2015

This Municipal Stormwater Illicit Discharge Detection and Elimination (IDDE) program was written to comply with the Phase II Municipal Stormwater NPDES Permit (Permit) for Western Washington; specifically, sections S4.C, S4.D, and S5.C.3. This manual is intended to establish and guide internal policy, procedures, training, scheduling and to document those items that are already in place.

Document Department: 

Civil Engineering Permit Application Form

Document File: 

Date Uploaded: 

Wed, 03/02/2016

This permit authorizes work in the City's Right-of-Way meaning all real property owned or held by the city in fee, or by way of easement, or dedicated to the public and located within the city, and used or intended for use as a street, alley, sidewalk, public way or easement for public or private utilities, whether developed or undeveloped. (KMC 12.14.030)

Document Department: 

2016 Stormwater Management Program

Document File: 

Date Uploaded: 

Mon, 02/09/2015

This SWMP is an attachment to the City’s 2014 Annual Report to the Department of Ecology for its Phase II NPDES Permit

*

In compliance with the provisions of The State of Washington Water Pollution Control Law Chapter 90.48 Revised Code of Washington and The Federal Water Pollution Control Act (The Clean Water Act Title 33 United States Code, Section 1251 et seq.

Document Department: 

Stormwater Capital Recovery Charge

Document File: 

Date Uploaded: 

Mon, 02/02/2015

AN ORDINANCE OF THE CITY OF KELSO, WASINGTON

AMENDING SECTIONS 13.10.050, 13.10.110 AND ADDING SECTION

13.10.115 OF THE KELSO MUNICIPAL CODE RELATING TO THE

STORMWATER MANAGEMENT UTILITY AND ESTABLISIDNG A

CAPITAL RECOVERY CHARGE FOR CONNECTION TO THE

INFRASTRUCTURE AND SERVICES PROVIDED BY THE UTILITY.

Document Department: 

Pages

Subscribe to RSS - Engineering